450 National


450 National

Mountain View, CA

PROJECT FEATURES

Construction completion: 2015

35,000 sf exterior + interior renovation of existing 1-story concrete tilt-up.

Expansion of existing windows and additional new windows

Grand entry canopy added with entry court and employee amenity space

Added stucco facing with reveals all around

Interior demolition of existing offices and existing restroom upgrade

Exposed wood ceiling maintained throughout

 

 

 

1700 Dell Ave

This 4-story office of 160,000 sf integrates historic materials native to the historic city of Campbell, CA.  The office fronts Dell Ave to define the street and has a massing that steps down to create a pedestrian scale.  A mix of historic materials including brick, corrugated metal and wood is crafted in a very clean and contemporary style that results in a building like no other in Silicon Valley.  The site includes surface parking and a 5-story concrete parking garage that shares similar elements

Read More

Castro Station

Castro Station

Mountain View, CA

Year Completed: 2014
Developer: PSAI Realty
Client: PSAI Realty
Contractor: Devcon Construction
Team: Nishkian/Chamberlain, Reed Associates, Steve Nakashima

Project Features

  • 3-story office between two existing offices on-site and adjacent to Caltrain on Evellyn Ave.

  • 3-story underground garage below serving 250 cars

  • 50,000 sf office space

  • Contemporary design relates to traditional adjacent buildings with industrial/rural vernacular

  • Animated street frontage with multiple entries

  • LEED Gold Certification in process

Project Services

  • Master Planning

  • Architecture

Lifelock - Mountain View

Lifelock

Mountain View, CA

Year Completed: 2016
Client: Lifelock

This project was designed to be Lifelock’s largest office in the SF Bay Area. It included a 60,000 sf Tenant Improvement within a 3-story building. e and

Project Features

  • Program included conference rooms, telepresence rooms, break areas, open office, all-hands sub-divisible room, Library and outdoor deck collaboration areas

  • An array of employee recreation areas including basketball, ring toss, ping pong and putt-putt golf.

  • Open Ceiling and floating cloud concepts

  • Reclaimed wood accents

Project Services

  • Interiors

Download Cut Sheet

GYFT

GYFT

Mountain View, CA

Year Completed: 2015
Client: GYFT/First Data
Tenant: GYFT/First Data
Contractor: Devcon Construction

Chang Architecture partnered founders of pioneering gift card company GYFT in creating new 15,000 sf headquarters within the Chang Architecture Designed Castro Station mid-rise. Designs reflect the high energy and creative personalities who office there. The First Data acquisition required modifications to the original programs, to fit an office within an office, and space for new security and technology compliance. The finished environments includes conference rooms, game rooms, phone rooms, break rooms and open offices, lobby and branded signage.

Project Features

  • 15,000 sf built out

  • Conference rooms

  • Break rooms

  • Game rooms

  • Open office stations

  • Interior branding and signage

Project Services

  • Interior branding

  • Interior environments

  • Signage

Tachyus

Tachyus

TACHYUS

San Mateo, CA

Year Completed: 2015
Developer: SKB
Client: Tachyus
Tenant: Tachyus
Contractor: Bryson Burns

Chang Architecture assisted Tachyus, a data start-up for the Oil Industry, in building out a 10 sf floor of 2121 El Camino high rise. The project includes a lobby with a branded oil derrick, conference rooms, phone rooms, open office environments, break rooms, and lounges.

Project Services

  • Interior environments
  • Interior branding 

Cupertino Main Street Major Retail Building

Target express at Cupertino Main Street

Cupertino, CA

Developer: Sandhill Property Company
Client: Sandhill Property Company
Contractor: Southbay Construction
Team: DCI Engineers, Guzzardo Partnership, Sandis Engineers

Project Features

  • First ground up Target Express in the country

  • Gateway for award winning Cupertino Main Street Development

  • Interplay of stucco, Ipe wood and metal panel

  • Development Trash Compaction facility integrated in design

Project Services

  • Architecture

 

 

Cupertino Landing

Cupertino Landing

Cupertino, CA

Year Completed: 2006
Developer: Sandhill Property Company
Client: Sandhill Property Company
Tenant: Apple
Contractor: Taisei Construction
Team: KPFF

The first certified LEED Silver building in Cupertino is nestled within a grove of Redwood trees and includes a 60,000 sf, 3-story office and parking structure. The contemporary style combines a palette of flat and profiled GFRC panels, curtain wall and punched windows. An upper level projection among existing redwood trees is evocative of a tree house and accentuates the main street entry.

Project Features

  • master planned 60,000 sf Class-A office currently occupied by Apple

  • three-story construction with GFRC panels fronting De Anza

  • four-story garage structure serving 250 cars, half below grade

  • first LEED Silver CS Certified project in Cupertino

  • many redwood trees maintained on-site

  • located at a prominent Silicon Valley intersection of De Anza Blvd and Mariani

Project Services

  • Master Planning
  • Architecture

 

Castro Station 1st Floor

LOVONGO

Mountain View, CA

Developer: PSAI Realty
Client: Lovongo

Current occupant:  Lovongo
Contractor: Devcon Construction

Project Features

  • market ready tenant Improvement includes open-ceiling concept with exposed steel and concrete floors
  • board room, offices and break area
  • break area with rolling high-top bar seating
  • designed custom furniture and cabinetry including a unique rolling high-bar counter for flexible collaboration
  • 6,500 sf Market-Ready Build-Out
  • exposed ceiling with dropped cloud acoustic tiles, suspended linear lights and HVAC ducting
  • stained concrete floors
  • Ipe wood slat accents
  • Sandblasted glass board room and offices

Project Services

  • market-ready tenant improvements
  • Interiors

Pericom Semiconductor Headquarters

 
 

Pericom Semiconductor Headquarters

Year Completed: 2013
Client: Pericom Semiconductor
Tenant: Pericom
Contractor: Gidel/Kocal
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Project Features

  • 100,000 sf office/lab tenant improvement within concurrent exterior upgrade

  • Dramatic two-story lobby facing freeway with stone flooring

  • Fitness room, cafeteria, training room, labs, server room, conference rooms and private offices

Project Services

  • Interior Environments

  • Market Re positioning

 

Synopsys Headquarters

Synopsys Headquarters

Mountain View, CA

Year Completed: 2014
Developer: Dostart Development
Client: Dostart Development
Tenant: Synopsys
Contractor: Devcon Construction
Team: Devcon Construction Nishkian/Menninger, Guzzardo Partnership, Kier/Wright

Two five story buildings create this 340,000 sf office campus that is sited to maximize freeway visibility along Hwy 237 while forming an intimate green space that preserved a cluster of existing redwood trees. An arc of GFRC panels inter-laced with glass curtain wall unifies the buildings and creates a gateway to a central plaza and pavilion. The project achieved LEED Gold certification.

Project Features

  • 340,000 sf Class A corporate office campus

  • two five-story buildings

  • located at intersection of Middlefield & Hwy 237

  • 15.6 acre development

  • LEED CS Gold Certified

  • maximized freeway visibility

  • existing redwood tree cluster preserved, forming an intimate green space

  • arc of GFRC panels inter-laced with glass curtain wall unifying the buildings and creating a gateway to a central plaza and pavillion.

PROJECT SERVICES

  • Master Planning

  • Architecture

Servicenow Headquarters

Servicenow

Santa Clara, CA

Year Completed: 2013
Developer: Eagle Ridge Partners
Client: Eagle Ridge Partners
Tenant: Servicenow
Contractor: Permian Builders
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Three 2-story office buildings of 1970’s vintage were transformed from pitched tile roof and dark glass buildings into contemporary modern campus of 150,000 sf. Two of the buildings were linked together with a new entrance wing that accommodated the main entry and an Executive Business Center, Training Rooms. Other features included an All-Hands Room, Telepresence Room and Dining Room with kitchen servery.

Project Features

  • 150,000 sf office tenant improvement within concurrent exterior upgrade
  • building link between two existing buildings
  • EBC, training Room, all-hands room, kitchen + cafeteria,  fitness room, telepresence room, conference rooms, phone rooms

Project Services

  • Interiors
  • Repositioning
  • Architecture

Servicenow Headquarters

Servicenow

Santa Clara, CA

Year Completed: 2013
Developer: Eagle Ridge Partners
Client: Eagle Ridge Partners and Servicenow
Tenant: Servicenow
Contractor: Permian Builders
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Three 2-story office buildings of 1970’s vintage were transformed from pitched tile roof and dark glass buildings into contemporary modern campus of 150,000 sf. Two of the buildings were linked together with a new entrance wing that accommodated the main entry and an Executive Business Center, Training Rooms. Other features included an All-Hands Room, Telepresence Room and Dining Room with kitchen servery.

Project Features

  • 150,000 sf full exterior upgrade and tenant improvement

  • Converted 1970’s pitched roof/tile buildings to contemporary style

  • Added building link, lobby, EBC between existing buildings

  • Outdoor café and collaboration seating

Project Services

  • Architecture

  • Interiors

  • Market repositioning