1620 South Loop Life-Science
Read More1620 South Loop Road Life-Science Building
1620 South Loop Life-Science
Read MoreUniversity Circle
University Circle, Life Science
East Palo Alto, CA
Final office building added to an existing 480,000 sf campus originally designed by Clifford Chang and constructed in 2001.
Client: Paceline Investors
Columbia Properties
Six story Life Science + Office of 180,000 sf
Three story underground parking with 540 cars that links to existing underground parking
Contemporary design integrated with existing traditional buildings through use of consistent Limestone and granite materials
Landscaped Podium above garage
Plaza entry at University Ave
PROJECT SERVICES:
Master Planning
Architecture
DeepMap Headquarters
Deepmap headquarters
Palo Alto, CA
Year Completed: 2019
Client: DeepMap
Contractor: BA-Builders
40,000 sf headquarters for company developing the eye for driver-less cars. The project was fast-tracked by designing and constructing in 2-phases which allowed DeepMap to occupy and operate many months earlier
Project Features
Car lab, open office, private offices, conference room, break room and collaboration spaces
Open ceiling spaces integrating existing concrete walls, steel, existing wood structure and suspended lights
Central conference room in open space includes a floating form evocative of automotive forms
Project Services
Interior Design
Pericom Semiconductor Headquarters
Pericom Semiconductor Headquarters
Year Completed: 2013
Client: Pericom Semiconductor
Tenant: Pericom
Contractor: Gidel/Kocal
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima
Project Features
100,000 sf office/lab tenant improvement within concurrent exterior upgrade
Dramatic two-story lobby facing freeway with stone flooring
Fitness room, cafeteria, training room, labs, server room, conference rooms and private offices
Project Services
Interior Environments
Market Re positioning
Alza Plaza
Alza headquarters
Mountain View, CA
Designed by Clifford Chang as Principal Designer for architect of record Hoover Assoc.
Year Completed: 2003
Developer: Peery/Arillaga
Client: Alza/Peery/Arillaga
Tenant: Google
Contractor: Vance Brown
Team: Middlebrook/Louie, EDAW
This three building campus, located adjacent to the Shoreline Amphitheater, is a consolidation of Alza’s separate facilities. The three 4-story buildings encompass 540,000 sf and are arranged in a pin-wheel configuration around a central court and connected by bridges. The exteriors are a combination of precast with brick veneer cladding, punched windows, and curtain wall. A 1,000 car garage sits below podium with extensive landscaping and a water feature above.
project features:
540,000 sf Class A corporate office campus located adjacent to the Shoreline Amphitheater
Currently occupied by top tier Google executives including Larry Page
Three 4-story buildings arranged in a pin-wheel configuration around a central court, over garage
1-level garage podium serving 1,000 cars
Landscaped podium with palm trees and central fountain
Brick precast panels
Buildings connected by overhead glass bridges
Project Services:
Master Planning
Architecture