Rhondo Thera Labs

Rhondo Thera Labs

Hayward, CA

Client: Bonneville Labs
Tenant: Rhondo Thera
Contractor: GCI

Research Life-Science lab including main labs with fume hoods, tissue culture labs with bio-safety cabibets, autoclave, freezer storage, loading, open office, conference rooms, private offices and break area.

Project Services

  • Interior Environments

 

Bonneville Labs

mt. eden labs

Hayward, CA

Client: Bonneville Labs
Tenant: Bonneville Labs
Contractor: GCI

40,000 sf Research Lab Tenant Improvement with 5 separate Life Science tenants with offices, main labs + support lab + loading spaces. Design incorporates a continuous service hallway that allows maximum flexibility for tenant expansion.

Project Features

  • Artwork by acclaimed Bay Area Artist Nathan Richard Phelps

  • New Backup generator

  • Fume hoods, Bio-Safety Cabinets, Autoclaves

  • Conference rooms with sliding glass doors linked to break room to create one large flex space

Project Services

  • Interior Environments

 

465 Cabot Lab Market-Ready

465 Cabot Market-Ready

South San Francisco, CA

Client: Autochlor
Contractor: Tico Construction

This interior project is within an existing 2-story office and includes 20,000 sf of Life Science infrastructure including chemistry and biology uses. The Labs are designed for maximum flexibility with movable benches, offset sinks and ceiling mounted power/data/air flex connections. Tissue culture, storage rooms, 40% administrative office provided to create a move-in ready environment

Project Services

  • Interior Design

Flextronics M9

Download Cut Sheet

Flextronics
M9

Milpitas, CA

Client: Flextronics
Contractor: Gidel + Kocal
Completed: 2020

40,000 sf facility designed for research and fabrication of confidential electronic devices. Design includes central Lab and assembly hub, open office, shipping/receiving and break area.

Project Services

  • Interiors

  • Labs / Manufacturing

FIT Technologies

Download Cut Sheet

fit -Foxconn Interconnect
Technologies

San Jose CA

Client: Newmark Knight Frank
Contractor: Pacific Ridge Builders
Completed: 2020

FIT manufactures and markets optoelectric components to improve connectivity between devices. This facility includes electric and x-ray research labs, open offices, conference rooms, break/all-hands room and private offices.

Project Services

  • Interiors

Joby Aviation

Download Cut Sheet

Joby
Aviation

San Bruno, CA

Client: Joby Aviation
Contractor: Cody Brock
Completed: 2018

This 100,000 sf facility is designed for the development of Flying Cars. The front half of the industrial warehouse was renovated with exposed infrastructure for electronic testing, research benches, office, conference rooms and a cafeteria. The rear portion houses electronic and mechanical test labs and a future manufacturing line area. Photos are limited due to the sensitivity of the company’s research.

Project Services

  • Interiors

  • R/D Labs

Labcyte Headquarters

Download Cut Sheet

Labcyte Headquarters

San Jose, CA

Client: Labcyte
Contractor: Gidel + Kocal
Completed: 2017

This 60,000 sf Tenant Improvement serves as Labcyte’s new Lab and administrative office headquarters. The facility provides Life Science research and development of acoustic technology to transport liquids. The build-out includes new lobby, research, manufacturing + automation labs, chemistry + biology labs, engineering labs, shipping/receiving, open office, private offices, conf. rooms, break and all-hands room.

Project Services

  • Interiors

Enterprise Car Sales + Rental

enterprise car sales + rental

Santa Clara, CA

Year Completed: 2016
Client: Enterprise
Contractor: Gidel + Kocal
Team: DCI Engineers, JMH Weiss, Verde Design, Acies Engineering

The first ground-up building in the Bay Area for Enterprise Rent-A-Car that sells cars and rents exotic cars. Included both exterior architecture and interior design

Project Features

  • Office sales and rental space, service canopy, car wash, break room and waiting area

  • Lot car display

Project Services

  • Architecture

  • Interior Design

DeepMap Headquarters

Deepmap headquarters

Palo Alto, CA

Year Completed: 2019
Client: DeepMap
Contractor: BA-Builders

40,000 sf headquarters for company developing the eye for driver-less cars. The project was fast-tracked by designing and constructing in 2-phases which allowed DeepMap to occupy and operate many months earlier

Project Features

  • Car lab, open office, private offices, conference room, break room and collaboration spaces

  • Open ceiling spaces integrating existing concrete walls, steel, existing wood structure and suspended lights

  • Central conference room in open space includes a floating form evocative of automotive forms

Project Services

  • Interior Design

Labcyte Headquarters

Labcyte Headquarters

San Jose, CA

Year Completed: 2015
Client:Labcyte
Contractor: Gidel + Kocal

This was a new headquarters for a Silicon Valley company revolutionizing liquid handling for life science research. Program included two floors of offices, conference rooms, research labs, manufacturing, shipping/receiving and cafeteria.

Project Features

  • 60,000 sf within a 2-story building

  • Includes Labs, offices, interior and exterior lunch rooms, private offices, open office + collaboration space

Project Services

  • Interior Design

499 Forbes

499 Forbs

South San Francisco, CA

Located in the heart of the South San Francisco biotech center, this project includes a 5-story Lab building and a separate parking structure.

Project Features

  • 130,000 sf core/shell Lab building with central restroom and elevator core, three stairs and a central double-story entry lobby with grand staircase

  • Each floor accommodates labs, a central line of Support Lab space and administrative office space

  • The contemporary design includes maximum curtain wall, metal panels and synthetic wood paneling

  • 4-story concrete garage accommodates 265 cars and incorporates similar metal panels throughout.

  • Site Planning provides a direct connection to the City’s Rails to Trails program

Project Services

  • Architecture

  • Master Planning

Castro Station 1st Floor

LOVONGO

Mountain View, CA

Developer: PSAI Realty
Client: Lovongo

Current occupant:  Lovongo
Contractor: Devcon Construction

Project Features

  • market ready tenant Improvement includes open-ceiling concept with exposed steel and concrete floors
  • board room, offices and break area
  • break area with rolling high-top bar seating
  • designed custom furniture and cabinetry including a unique rolling high-bar counter for flexible collaboration
  • 6,500 sf Market-Ready Build-Out
  • exposed ceiling with dropped cloud acoustic tiles, suspended linear lights and HVAC ducting
  • stained concrete floors
  • Ipe wood slat accents
  • Sandblasted glass board room and offices

Project Services

  • market-ready tenant improvements
  • Interiors

Pericom Semiconductor Headquarters

 
 

Pericom Semiconductor Headquarters

Year Completed: 2013
Client: Pericom Semiconductor
Tenant: Pericom
Contractor: Gidel/Kocal
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Project Features

  • 100,000 sf office/lab tenant improvement within concurrent exterior upgrade

  • Dramatic two-story lobby facing freeway with stone flooring

  • Fitness room, cafeteria, training room, labs, server room, conference rooms and private offices

Project Services

  • Interior Environments

  • Market Re positioning

 

Solta Medical Headquarters

solta medical Headquarters

Hayward, CA

Client: Solta Medical
Tenant: Solta Medical
Contractor: JM O'Neil

85,000 sf tenant improvement to accommodate Thermage’s new corporate, Lab and manufacturing facilities located in two adjacent buildings in the Point Eden Business Park. The office building blends new and existing elements, adds new research labs and defines open office divisions. The manufacturing building includes clean room labs, instrument manufacturing, testing and warehouse distribution functions with additional office space included. Fastrack process of design and construction completed within a 6 month period. 2nd phase Interior Branding work included display, signage, artwork and furniture selection.

Project Features

  • 100,000 sf office + manufacturing tenant improvement in two adjacent buildings

  • collaborated with product inventors and designers to communicate the origins of the brand

  • collaborated with CEO and leadership team to distill the visual attributes of the brand and articulate the brand throughout the headquarters and manufacturing campus.

  • design included custom-designed product, audio-visual and patent displays and a marketing demonstration showroom.

  • artwork layout integrated throughout facility

  • developed visual communications and identity

Project Services

  • Interior Environments

 

Java Metro Market Ready TI

Java Metro Lobby/4th Floor

Sunnyvale, CA 

Developer: Exterra Realty
Client: Exterra Realty
Contractor: ABC Contractors

This 10,000 sf Market-Ready Tenant Improvement is located on the ground floor of the Java Metro Center office building in Moffett Park. Scope included open office, board room, select private offices, break-room for 25 people, carpet tile, suspended ceiling, indirect lighting and mecho-shades.

Project Features

  • 10,000 sf Market-Ready Tenant improvements, ground floor of the Java Metro Center office
  • open office, board room, select private offices, break-room for 25 people, carpet tile, suspended ceiling, indirect lighting and mecho-shades.

Project Services

  • Interiors 
  • Market-ready tenant improvements

 

 

 

 

Servicenow Headquarters

Servicenow

Santa Clara, CA

Year Completed: 2013
Developer: Eagle Ridge Partners
Client: Eagle Ridge Partners
Tenant: Servicenow
Contractor: Permian Builders
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Three 2-story office buildings of 1970’s vintage were transformed from pitched tile roof and dark glass buildings into contemporary modern campus of 150,000 sf. Two of the buildings were linked together with a new entrance wing that accommodated the main entry and an Executive Business Center, Training Rooms. Other features included an All-Hands Room, Telepresence Room and Dining Room with kitchen servery.

Project Features

  • 150,000 sf office tenant improvement within concurrent exterior upgrade
  • building link between two existing buildings
  • EBC, training Room, all-hands room, kitchen + cafeteria,  fitness room, telepresence room, conference rooms, phone rooms

Project Services

  • Interiors
  • Repositioning
  • Architecture

455 + 465 Bernardo Ave.

455 + 465 Bernardo Ave.

Mountain View, CA

Year Completed: 2008
Developer: Eagle Ridge Partners
Client: Eagle Ridge Partners
Tenant: Toyota
Contractor: Gary Horn
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Market repositioning transformed two existing concrete tilt-up buildings into a contemporary office.  Added new entry porticos composed of sandblasted glass panels, stainless steel angles and a steel trellis cap.  Renovation included reskinning the concrete walls with stucco finishes and expanded windows. Existing seismic shear walls were converted to accent fin-walls extending into the landscape with a bold two color scheme.  The buildings were designed to accommodate single or separate tenants.

  • 30,000 sf + 55,000 sf repositioning of 1-story industrial concrete-tilt buildings
  • New entry porticos facing street
  • Frosted glass panels over solid wall project illusion of more glass
  • Stucco and reveals applied over existing rock facing
  • Deep overhangs converted to contemporary arcade facades
  • Additional windows added

PROJECT SERVICES

  • Architecture
  • Market repositioning
  • master planning
  • Signage

Thermage Headquarters

Download Cut Sheet

Thermage Headquarters

Hayward, CA

Client: Thermage
Contractor: JM O'Neil
Completed: 2005

85,000 square feet tenant improvement to accommodate Thermage’s new corporate and Lab/Manufacturing facilities located in two adjacent buildings in the Point Eden Business Park. The office building blends new and existing elements, adds new research labs and defines open office divisions. The manufacturing building includes instrument manufacturing, testing and warehouse distribution functions with additional office space included. Fastrack process of design and construction completed within a 6 month period. 2nd phase Interior Branding work included display, signage, artwork and furniture selection.

Project Features

  • 100,000 sf Office/Lab/Manufacturing Tenant Improvement in two adjacent buildings

  • Branding design included special product, audio-visual and patent displays

  • Artwork layout integrated throughout facility

Project Services

  • Interiors