FIT Technologies

Download Cut Sheet

fit -Foxconn Interconnect
Technologies

San Jose CA

Client: Newmark Knight Frank
Contractor: Pacific Ridge Builders
Completed: 2020

FIT manufactures and markets optoelectric components to improve connectivity between devices. This facility includes electric and x-ray research labs, open offices, conference rooms, break/all-hands room and private offices.

Project Services

  • Interiors

Joby Aviation

Download Cut Sheet

Joby
Aviation

San Bruno, CA

Client: Joby Aviation
Contractor: Cody Brock
Completed: 2018

This 100,000 sf facility is designed for the development of Flying Cars. The front half of the industrial warehouse was renovated with exposed infrastructure for electronic testing, research benches, office, conference rooms and a cafeteria. The rear portion houses electronic and mechanical test labs and a future manufacturing line area. Photos are limited due to the sensitivity of the company’s research.

Project Services

  • Interiors

  • R/D Labs

DeepMap Headquarters

Deepmap headquarters

Palo Alto, CA

Year Completed: 2019
Client: DeepMap
Contractor: BA-Builders

40,000 sf headquarters for company developing the eye for driver-less cars. The project was fast-tracked by designing and constructing in 2-phases which allowed DeepMap to occupy and operate many months earlier

Project Features

  • Car lab, open office, private offices, conference room, break room and collaboration spaces

  • Open ceiling spaces integrating existing concrete walls, steel, existing wood structure and suspended lights

  • Central conference room in open space includes a floating form evocative of automotive forms

Project Services

  • Interior Design

Pape Machinery

Download Cut Sheet

Pape machinery

Fremont, CA

Client: Pape Machinery
Contractor: W.W.C.I
Team: JMH Weiss, Ashley Vance, Callander Assoc., Acies Engineering

This is the 1st ground-up facility for Pape, the premier supplier of heavy large-scale construction equipment. The project provides new equipment sales, rentals, administrative offices and maintenance bays. The design utilizes industrial materials such as vertical standing seam metal panels, corrugated panels, flat metal panels and exposed steel angles.

  • Two story office and machine display

  • Parts storage

  • Maintenance Bays

  • Site equipment display + storage

PROJECT SERVICES

  • Architecture

Pericom Semiconductor Headquarters

 
 

Pericom Semiconductor Headquarters

Year Completed: 2013
Client: Pericom Semiconductor
Tenant: Pericom
Contractor: Gidel/Kocal
Team: John Yadegar Assoc., Reed Assoc., Steve Nakashima

Project Features

  • 100,000 sf office/lab tenant improvement within concurrent exterior upgrade

  • Dramatic two-story lobby facing freeway with stone flooring

  • Fitness room, cafeteria, training room, labs, server room, conference rooms and private offices

Project Services

  • Interior Environments

  • Market Re positioning

 

Thermage Headquarters

Download Cut Sheet

Thermage Headquarters

Hayward, CA

Client: Thermage
Contractor: JM O'Neil
Completed: 2005

85,000 square feet tenant improvement to accommodate Thermage’s new corporate and Lab/Manufacturing facilities located in two adjacent buildings in the Point Eden Business Park. The office building blends new and existing elements, adds new research labs and defines open office divisions. The manufacturing building includes instrument manufacturing, testing and warehouse distribution functions with additional office space included. Fastrack process of design and construction completed within a 6 month period. 2nd phase Interior Branding work included display, signage, artwork and furniture selection.

Project Features

  • 100,000 sf Office/Lab/Manufacturing Tenant Improvement in two adjacent buildings

  • Branding design included special product, audio-visual and patent displays

  • Artwork layout integrated throughout facility

Project Services

  • Interiors

Alza Plaza

Alza headquarters

Mountain View, CA

Designed by Clifford Chang as Principal Designer for architect of record Hoover  Assoc.

Year Completed: 2003
Developer: Peery/Arillaga
Client: Alza/Peery/Arillaga
Tenant: Google
Contractor: Vance Brown
Team: Middlebrook/Louie, EDAW

This three building campus, located adjacent to the Shoreline Amphitheater, is a consolidation of Alza’s separate facilities. The three 4-story buildings encompass 540,000 sf and are arranged in a pin-wheel configuration around a central court and connected by bridges. The exteriors are a combination of precast with brick veneer cladding, punched windows, and curtain wall. A 1,000 car garage sits below podium with extensive landscaping and a water feature above.

project features:

  • 540,000 sf Class A corporate office campus located adjacent to the Shoreline Amphitheater

  • Currently occupied by top tier Google executives including Larry Page

  • Three 4-story buildings arranged in a pin-wheel configuration around a central court, over garage

  • 1-level garage podium serving 1,000 cars

  • Landscaped podium with palm trees and central fountain

  • Brick precast panels

  • Buildings connected by overhead glass bridges

Project Services:

  • Master Planning

  • Architecture