2600 El Camino

2600 El Camino

Stanford Research Park, Palo Alto, CA

 

  • New construction -70,000 sf, 4-story office

  • Located in Stanford Research Park

  • Fronting El Camino with outdoor amenity spaces on a variety of levels

  • Palette of limestone wall panels and a sculptural metal panel form that cantilevers toward the main street and entry

  • Re-use of existing underground garage

  • Construction completion June, 2020

 

PROJECT SERVICES

  • Architecture

3301 Olcotte Office Campus

3301 Olcotte Office Campus

Santa Clara, CA

Sited along Freeway 101 at the San Tomas interchange, this project positions two buildings totaling 350,000 sf. The campus can then serve as 2 full building tenants or 1 tenant facility.

Project Features

  • Two 5-story buildings, including a 200,000 sf one and a 150,000 sf one.

  • Similar contemporary and compositional styling with a bridge interconnecting at 3 levels.

  • 2-story underground garage with 530 cars

  • Buildings organized around a central entry court with amenity space

Project Services

  • Master Planning

  • Architecture

University Circle

University Circle, Life Science

East Palo Alto, CA

Final office building added to an existing 480,000 sf campus originally designed by Clifford Chang and constructed in 2001.

Client: Paceline Investors
Columbia Properties

  • Six story Life Science + Office of 180,000 sf

  • Three story underground parking with 540 cars that links to existing underground parking

  • Contemporary design integrated with existing traditional buildings through use of consistent Limestone and granite materials

  • Landscaped Podium above garage

  • Plaza entry at University Ave

PROJECT SERVICES:

  • Master Planning

  • Architecture

675 Almanor Garage

675 Almanor Garage

Sunnyvale, CA

As part of a 4-story new office complex this 5-story garage is a concrete long-span structure integrating metal panels + synthetic wood panels that share the same architecture as the office building. The elevator and stair highlight the corner closest to the office.

Project Services

  • Architecture

Castro Station

Castro Station

Mountain View, CA

Year Completed: 2014
Developer: PSAI Realty
Client: PSAI Realty
Contractor: Devcon Construction
Team: Nishkian/Chamberlain, Reed Associates, Steve Nakashima

Project Features

  • 3-story office between two existing offices on-site and adjacent to Caltrain on Evellyn Ave.

  • 3-story underground garage below serving 250 cars

  • 50,000 sf office space

  • Contemporary design relates to traditional adjacent buildings with industrial/rural vernacular

  • Animated street frontage with multiple entries

  • LEED Gold Certification in process

Project Services

  • Master Planning

  • Architecture

Lifelock - Mountain View

Lifelock

Mountain View, CA

Year Completed: 2016
Client: Lifelock

This project was designed to be Lifelock’s largest office in the SF Bay Area. It included a 60,000 sf Tenant Improvement within a 3-story building. e and

Project Features

  • Program included conference rooms, telepresence rooms, break areas, open office, all-hands sub-divisible room, Library and outdoor deck collaboration areas

  • An array of employee recreation areas including basketball, ring toss, ping pong and putt-putt golf.

  • Open Ceiling and floating cloud concepts

  • Reclaimed wood accents

Project Services

  • Interiors

Download Cut Sheet

Cupertino Landing

Cupertino Landing

Cupertino, CA

Year Completed: 2006
Developer: Sandhill Property Company
Client: Sandhill Property Company
Tenant: Apple
Contractor: Taisei Construction
Team: KPFF

The first certified LEED Silver building in Cupertino is nestled within a grove of Redwood trees and includes a 60,000 sf, 3-story office and parking structure. The contemporary style combines a palette of flat and profiled GFRC panels, curtain wall and punched windows. An upper level projection among existing redwood trees is evocative of a tree house and accentuates the main street entry.

Project Features

  • master planned 60,000 sf Class-A office currently occupied by Apple

  • three-story construction with GFRC panels fronting De Anza

  • four-story garage structure serving 250 cars, half below grade

  • first LEED Silver CS Certified project in Cupertino

  • many redwood trees maintained on-site

  • located at a prominent Silicon Valley intersection of De Anza Blvd and Mariani

Project Services

  • Master Planning
  • Architecture

 

Java Metro Center

Java Metro Center

Sunnyvale, CA

Year Completed: 2007
Developer: Exterra Realty/SCM Properties
Client: Exterra Realty/SCM Properties
Contractor: Wentz Construction
Team: Louie International, Reed Associates, JMH Weiss

This 400,000 sf office campus includes a corner 5-story building anchoring the main intersection, two 4-story buildings flanking either side and two parking structures accommodating 500 cars. Buildings are arranged around a land-scaped court with amphitheater and sport activity areas. Facades integrate precast, curtain wall and punched windows with aluminum sun-shades and visors accenting key locations. Designed for LEED Silver Certification.

Project Features

  • 400,000 sf Class A corporate office campus

  • Two ,4-story buildings around a central 5-story corner building

  • 5-Level parking structure serving 500 cars

  • 13-acre development

  • LEED Silver

  • Central landscape court defined by structures

  • Amenity areas with outdoor lounge, sports and amphitheater seating

  • Facades integrate precast, curtain wall and punched windows with aluminum sunshades and visors accenting key locations.

  • Incorporated signature sculpture by Guy Dill

Project Services

  • Master Planning

  • Architecture

Alza Plaza

Alza headquarters

Mountain View, CA

Designed by Clifford Chang as Principal Designer for architect of record Hoover  Assoc.

Year Completed: 2003
Developer: Peery/Arillaga
Client: Alza/Peery/Arillaga
Tenant: Google
Contractor: Vance Brown
Team: Middlebrook/Louie, EDAW

This three building campus, located adjacent to the Shoreline Amphitheater, is a consolidation of Alza’s separate facilities. The three 4-story buildings encompass 540,000 sf and are arranged in a pin-wheel configuration around a central court and connected by bridges. The exteriors are a combination of precast with brick veneer cladding, punched windows, and curtain wall. A 1,000 car garage sits below podium with extensive landscaping and a water feature above.

project features:

  • 540,000 sf Class A corporate office campus located adjacent to the Shoreline Amphitheater

  • Currently occupied by top tier Google executives including Larry Page

  • Three 4-story buildings arranged in a pin-wheel configuration around a central court, over garage

  • 1-level garage podium serving 1,000 cars

  • Landscaped podium with palm trees and central fountain

  • Brick precast panels

  • Buildings connected by overhead glass bridges

Project Services:

  • Master Planning

  • Architecture