675 Almanor

675 Almanor

675 Almanor 

Peery Park, Sunnyvale, CA

Developer: Dollinger Properties
Contractor: Devcon Construction
Design Team: DCI Engineers, Acies Engineering, Reed Associates
Completion: June, 2020

Part of the expansive Peery Park plan, this new 4-story office is a contemporary design that addresses Almanor Ave and Highway 101 frontage. A series of bent planes of metal and wood create corner towers and strategic entry points.

  • http://www.mercurynews.com/2017/03/22/sunnyvales-peery-park-could-see-new-office-building-with-public-outdoor-space/

  • http://www.mercurynews.com/2017/07/26/big-changes-proposed-for-macys-in-downtown-sunnyvale/

  • Five story, 165,000 sf office new class A office

  • Project Features:

  • Roof Deck

  • Materials palette includes metal panels, wood, and curtain-wall

  • Four story parking structure for 300 cars with subterranean level

  • Retail component - 2,500 square feet of retail

  • demolition of an existing 60,332-square-foot building at 675 Almanor Ave. that was built in 1986

  • Public recreation area on Almanor Avenue with exercise equipment and a rock garden

  • Redwood trees on site will be preserved and native plants will be used landscaping

PROJECT SERVICES

  • Master Planning

  • Architecture

 

675 Almanor Garage

675 Almanor Garage

Sunnyvale, CA

As part of a 4-story new office complex this 5-story garage is a concrete long-span structure integrating metal panels + synthetic wood panels that share the same architecture as the office building. The elevator and stair highlight the corner closest to the office.

Project Services

  • Architecture

1700 Dell Ave

This 4-story office of 160,000 sf integrates historic materials native to the historic city of Campbell, CA.  The office fronts Dell Ave to define the street and has a massing that steps down to create a pedestrian scale.  A mix of historic materials including brick, corrugated metal and wood is crafted in a very clean and contemporary style that results in a building like no other in Silicon Valley.  The site includes surface parking and a 5-story concrete parking garage that shares similar elements

Read More