280 Bernardo Addition + Renovation

280 Bernardo

Mountain View, CA

  • Repositioning and addition of 116,000 sf concrete tilt-up industrial building

  • New glass lobby added fronting Central Expressway and enclosing an internal collaboration courtyard with glass garage door access

  • New scissor roof line developed through addition of corrugated + perforated Corten metal panels. This presents a transparent skin that shows the metal diagonal bracing behind

  • New vehicular entry drive to lobby defines a garden for existing Redwood Trees

  • Completion July, 2020

 

Project Services

  • Architecture

  • Market Repositioning

2205 Fortune


2205 Fortune

San Jose, CA

PROJECT FEATURES

Construction completion: 2023

35,000 sf exterior + interior renovation of existing 1-story concrete tilt-up for office/warehouse use

New offices, conference rooms and restrooms

New exterior paint scheme





 

 

 

Bonneville Labs

mt. eden labs

Hayward, CA

Client: Bonneville Labs
Tenant: Bonneville Labs
Contractor: GCI

40,000 sf Research Lab Tenant Improvement with 5 separate Life Science tenants with offices, main labs + support lab + loading spaces. Design incorporates a continuous service hallway that allows maximum flexibility for tenant expansion.

Project Features

  • Artwork by acclaimed Bay Area Artist Nathan Richard Phelps

  • New Backup generator

  • Fume hoods, Bio-Safety Cabinets, Autoclaves

  • Conference rooms with sliding glass doors linked to break room to create one large flex space

Project Services

  • Interior Environments

 

Lawrence Station

Lawrence Station

 

Lawrence Station

Santa Clara, CA

Developer:  Lennar Commercial
Contractor:  San Jose Construction
Team:  JMH Weiss, Verde Design
Completion: June, 2020

Phase two of a two building campus:  Five story class A office building anchoring the corner of Lawrence Expressway and Keifer Road.  Area includes 200,000 sf and a 7,000 sf roof garden.  

Project Features

  • 200,000 sf, 5-story class A office campus

  • Roof Garden

  • Cantilevered Floors

  • Materials palette: metal panels, simulated wood and curtain wall

  • Parking structure serving both buildings with 1,000 cars.

  • PROJECT SERVICES

  • Master Planning

  • Architecture

  • Site Amenities landscape elements

 

2600 El Camino

2600 El Camino

Stanford Research Park, Palo Alto, CA

 

  • New construction -70,000 sf, 4-story office

  • Located in Stanford Research Park

  • Fronting El Camino with outdoor amenity spaces on a variety of levels

  • Palette of limestone wall panels and a sculptural metal panel form that cantilevers toward the main street and entry

  • Re-use of existing underground garage

  • Construction completion June, 2020

 

PROJECT SERVICES

  • Architecture

3301 Olcotte Office Campus

3301 Olcotte Office Campus

Santa Clara, CA

Sited along Freeway 101 at the San Tomas interchange, this project positions two buildings totaling 350,000 sf. The campus can then serve as 2 full building tenants or 1 tenant facility.

Project Features

  • Two 5-story buildings, including a 200,000 sf one and a 150,000 sf one.

  • Similar contemporary and compositional styling with a bridge interconnecting at 3 levels.

  • 2-story underground garage with 530 cars

  • Buildings organized around a central entry court with amenity space

Project Services

  • Master Planning

  • Architecture

675 Almanor

675 Almanor

675 Almanor 

Peery Park, Sunnyvale, CA

Developer: Dollinger Properties
Contractor: Devcon Construction
Design Team: DCI Engineers, Acies Engineering, Reed Associates
Completion: June, 2020

Part of the expansive Peery Park plan, this new 4-story office is a contemporary design that addresses Almanor Ave and Highway 101 frontage. A series of bent planes of metal and wood create corner towers and strategic entry points.

  • http://www.mercurynews.com/2017/03/22/sunnyvales-peery-park-could-see-new-office-building-with-public-outdoor-space/

  • http://www.mercurynews.com/2017/07/26/big-changes-proposed-for-macys-in-downtown-sunnyvale/

  • Five story, 165,000 sf office new class A office

  • Project Features:

  • Roof Deck

  • Materials palette includes metal panels, wood, and curtain-wall

  • Four story parking structure for 300 cars with subterranean level

  • Retail component - 2,500 square feet of retail

  • demolition of an existing 60,332-square-foot building at 675 Almanor Ave. that was built in 1986

  • Public recreation area on Almanor Avenue with exercise equipment and a rock garden

  • Redwood trees on site will be preserved and native plants will be used landscaping

PROJECT SERVICES

  • Master Planning

  • Architecture

 

University Circle

University Circle, Life Science

East Palo Alto, CA

Final office building added to an existing 480,000 sf campus originally designed by Clifford Chang and constructed in 2001.

Client: Paceline Investors
Columbia Properties

  • Six story Life Science + Office of 180,000 sf

  • Three story underground parking with 540 cars that links to existing underground parking

  • Contemporary design integrated with existing traditional buildings through use of consistent Limestone and granite materials

  • Landscaped Podium above garage

  • Plaza entry at University Ave

PROJECT SERVICES:

  • Master Planning

  • Architecture

680 Charter Office + Life Science

680 Charter R+D


Client: Bauen Capital

Construction: Starts 2023

This repositioning of a single-story concrete tilt-up building incorporates a new skin of perforated, corrugated Corten metal panels applied over the concrete walls. The translucent panels rise above the existing roof to convey a large sculptural presence and express the diagonal steel stud structure behind. New windows are added in addition to a full seismic upgrade.

Project Features

Corrugated/perforated Corten Metal Panels

Project Services

  • Architecture

 

675 Almanor Garage

675 Almanor Garage

Sunnyvale, CA

As part of a 4-story new office complex this 5-story garage is a concrete long-span structure integrating metal panels + synthetic wood panels that share the same architecture as the office building. The elevator and stair highlight the corner closest to the office.

Project Services

  • Architecture

FIT Technologies

Download Cut Sheet

fit -Foxconn Interconnect
Technologies

San Jose CA

Client: Newmark Knight Frank
Contractor: Pacific Ridge Builders
Completed: 2020

FIT manufactures and markets optoelectric components to improve connectivity between devices. This facility includes electric and x-ray research labs, open offices, conference rooms, break/all-hands room and private offices.

Project Services

  • Interiors

Joby Aviation

Download Cut Sheet

Joby
Aviation

San Bruno, CA

Client: Joby Aviation
Contractor: Cody Brock
Completed: 2018

This 100,000 sf facility is designed for the development of Flying Cars. The front half of the industrial warehouse was renovated with exposed infrastructure for electronic testing, research benches, office, conference rooms and a cafeteria. The rear portion houses electronic and mechanical test labs and a future manufacturing line area. Photos are limited due to the sensitivity of the company’s research.

Project Services

  • Interiors

  • R/D Labs

Enterprise Car Sales + Rental

enterprise car sales + rental

Santa Clara, CA

Year Completed: 2016
Client: Enterprise
Contractor: Gidel + Kocal
Team: DCI Engineers, JMH Weiss, Verde Design, Acies Engineering

The first ground-up building in the Bay Area for Enterprise Rent-A-Car that sells cars and rents exotic cars. Included both exterior architecture and interior design

Project Features

  • Office sales and rental space, service canopy, car wash, break room and waiting area

  • Lot car display

Project Services

  • Architecture

  • Interior Design

DeepMap Headquarters

Deepmap headquarters

Palo Alto, CA

Year Completed: 2019
Client: DeepMap
Contractor: BA-Builders

40,000 sf headquarters for company developing the eye for driver-less cars. The project was fast-tracked by designing and constructing in 2-phases which allowed DeepMap to occupy and operate many months earlier

Project Features

  • Car lab, open office, private offices, conference room, break room and collaboration spaces

  • Open ceiling spaces integrating existing concrete walls, steel, existing wood structure and suspended lights

  • Central conference room in open space includes a floating form evocative of automotive forms

Project Services

  • Interior Design

Labcyte Headquarters

Labcyte Headquarters

San Jose, CA

Year Completed: 2015
Client:Labcyte
Contractor: Gidel + Kocal

This was a new headquarters for a Silicon Valley company revolutionizing liquid handling for life science research. Program included two floors of offices, conference rooms, research labs, manufacturing, shipping/receiving and cafeteria.

Project Features

  • 60,000 sf within a 2-story building

  • Includes Labs, offices, interior and exterior lunch rooms, private offices, open office + collaboration space

Project Services

  • Interior Design

Murphy Square II

Murphy Square II

Sunnyvale, CA

Developer: PSAI Realty
Contractor: Devcon Construction
Team: Paul Reed Associates, Steve Nakashima

Located in the heart of the new Sunnyvale downtown, this 4-story office building is an expansion to the historical Murphy Square building that anchors the traditional Murphy Avenue retail street.

Project Features

  • 63,000 sf of office on 4-floors

  • 3 levels of underground parking serving the existing and new building

  • Corner tower anchors the street corner and establishes a gateway to the historic downtown

  • Hacienda style architecture integrates with existing building including white stucco walls, pitched tile roofs, arches and iron bar details

  • Roof top garden

Project Services

  • Architecture

Pape Machinery

Download Cut Sheet

Pape Machinery

Fremont, CA

Client: Pape Machinery
Contractor: W.W.C.I
Team: JMH Weiss, Ashley Vance, Callander Assoc., Acies Engineering

This is the 1st ground-up facility for Pape, the premier supplier of heavy large-scale construction equipment. The project provides new equipment sales, rentals, administrative offices and maintenance bays. The design utilizes industrial materials such as vertical standing seam metal panels, corrugated panels, flat metal panels and exposed steel angles.

  • Two story office and machine display

  • Parts storage

  • Maintenance Bays

  • Site equipment display + storage

PROJECT SERVICES

  • Architecture